Miner Hosting

Canadian

Sites

Alberta Miner Hosting Sites Shown

Rocky Mountain House, AB Canada Site 2

60MW

SITE FULL

$55.00$65.00/MWh

Power Cost

Flexible

Contract Length

Description

For this site, we are looking for a partner to develop mining infrastructure. This site requires a deposit to be held in escrow for the DD period and significant CAPEX on the client side. This is in order to construct any infrastructure required to support your mining equipment. The client on side does not need to handle power generation. Scheduled completion date is Q2 2023. More details can be provided upon request.


Caroline, AB Canada Site

40MW

SITE FULL

$86.00/MWh

Power Cost

1 Year

Minimum Contract Length

Description

Constructed in a facility planned for a very large grow-op, this site features a massive building and a sizable power source. Miner Hosting at this site is all-inclusive, meaning rack space, Ethernet, leasing, security, cables and power are all part of the hosting cost. All we need is your miners! 800kW is available with a 3-week deployment time, and up to 40MW is available all together. This site is powered by natural gas , and all regulatory permits are already taken care of. The initial deposit for hosting at this site is 2 months of power costs.


Grande Prairie, AB Canada Site

10MW

SITE FULL

$65.00/MWh

Power Cost

1 Year

Minimum Contract Length

Description

Featuring a large Solar™ T-70 gas turbine and and reciprocating engines, this site has plenty of power generation that is already installed and ready to energize your mining equipment. On this site, you can BYOC or lease a container.


Lacombe, AB Canada Site

6MW

SITE FULL

$65.00/MWh

Power Cost

1 Year

Minimum Contract Length

Description

Constructed from a converted peaker plant and powered by natural gas, this site delivers the peak in reliability and technology. This site is BYOC, meaning that you will need to bring your own container, or lease/purchase it from us. The minimum deposit at this site is 2 months, and the total power delivery is 6MW, with all of that available as of Q4 ’22. This site can be fully deployed within a month.


Rocky Mountain House, AB Canada Site

6MW

SITE FULL

$67.00/MWh

Power Cost

2 Year

Contract Length

Description

With a low cost per kilowatt and power already included, all you need to get mining at this site is a datacenter pod or mining container to get up and running. All regulatory permits are already completed. 2MW of power is already available for deployment with a total potential for 6MW. All power comes from natural gas generation, and this site has a deployment time of 30 to 60 days, and requires initial deposit of 3 months worth of power.


Sylvan Lake, AB Canada Site

1.1MW

SITE FULL

$67.00/MWh

Power Cost

1 Year

Contract Length

Description

This site is perfect for those seeking minimum deployment time. With a datacenter pod already in place and ready to deliver 415V, your miners can be deployed immediately. This site runs on natural gas, and regulatory approvals such as noise/environmental are not required due to the site’s size. The starting deposit at this site is 2 months of power cost.


American

Sites

Colorado Miner Hosting Sites Shown

Limon, CO USA Site A

10MW

SITE FULL

$63.00/MWh

Power Cost

2 Year

Contract Length

Description

Located just outside of Limon, Colorado, this site is perfect for miners based in the USA. Power cost at this site is very low and lots of power is available, meaning that this site is perfect for institutional clients. All power on site comes from natural gas generation and regulatory approvals are currently in progress. Availability for hosting is 4 months, and the minimum contract length is 2 years. The starting deposit at this site is 4 months.

Site Energy Partner

Limon, CO USA Site B

1MW

SITE FULL

$69.00/MWh

Power Cost

1 Year

Contract Length

Description

Like Limon Site A, this site is located just outside Limon, Colorado. This site is available immediately and has generation included. Regulatory approvals are already taken care of. All you need to get mining here is a datacenter pod full of miners. Power is generated from natural gas. The starting deposit at this site is equivalent to 2 months of power costs.

Company Logo for Miner Hosting Partner Rustad Energy
Site Energy Partner

Interested in Miner Hosting?

We have sites in both Canada and the United States that can host your miners or mining container. There are many ways to work with you as a miner. We offer all-inclusive hosting, simple power power purchase agreements, and we can even sell you natural gas if you choose to generate your own power.

You can submit any general inquiry to our hosting inquiry form.